Your plant already collects the numbers. We build the manufacturing software that gets them off the shop floor and in front of the people planning the next shift.

How We Help

What the work looks like in Industry & Manufacturing.

Getting Data Off the Shop Floor

Machines record far more than most plants ever read. The output sits in a controller, on a local PC, or in a log a supervisor prints at the end of a shift. We build the collection layer that reads those sources on a schedule and writes them into one database, then the screen that shows output, scrap and downtime by machine. Where a line is too old to talk to anything, we put a tablet in front of the operator and take the reading that way, rather than quoting you for an integration that cannot be built.

Stock and Dispatch That Match the Rack

A count that is wrong by two pallets will stop a dispatch, and it usually gets found by a driver waiting at the gate. We build the goods in, picking and goods out screens so stock moves when the barcode is scanned. Dispatch notes, labels and customer paperwork all come off that same record. If you already run an ERP, we build against it, so finance keeps working in the system they know.

When a Machine Stops

Downtime is argued about far more often than it is measured. We put a short reason code in front of whoever restarts the line, so the log builds itself over a few weeks and you get an honest ranking of what keeps failing. The IT side gets the same attention. We monitor the servers production cannot run without, hold saved configurations for the equipment most likely to fail, and test the restore instead of reading the backup report. Changes go into a window the plant has agreed to, which usually means a night or a Sunday.

The Operator Decides Whether This Works

Every shop floor system lives or dies on whether the person on the line will actually use it, and that is decided by details nobody in an office thinks about. A screen that needs a password typed with gloves on will be left logged in on one account for the whole shift, and your traceability is gone. A dropdown of forty reason codes gets whatever is at the top of the list. A tablet that has to be tapped twice while holding a part gets tapped once, later, from memory. So the interface is designed against the actual conditions: badge or card sign-in rather than typing, four or five reason codes rather than forty, targets big enough for a gloved hand, and readable under the lighting the plant genuinely has rather than the lighting in a specification. The test is not whether it works in a demonstration. It is whether the data is still honest three weeks in, when nobody is watching and the line is behind.

Old Equipment Is Not Going To Be Replaced

A machine bought in 1998 that still holds tolerance will not be replaced because its controller is awkward to read, and no plant manager should be asked to justify that. So the work has to start from the equipment you have. Older controllers frequently expose more than anyone assumes: a serial port, a file the machine writes to a local PC, an OPC server installed years ago by an integrator and never used since, and finding out is a short investigation rather than a project. Where a line genuinely cannot talk to anything, the honest answer is an operator entering the reading on a tablet, which costs a fraction of a retrofit and gets you the number. What matters far more than how the data is captured is that it is captured consistently, because a downtime ranking built from four weeks of tablet entries is worth considerably more than an integration that was never finished.

Common Challenges

What we are usually called in to fix.

  • Machine and line data that stays on the shop floor and never reaches the office
  • Downtime logged on paper, so nobody can say which machine costs you the most
  • Stock counts in the system that do not match what is on the rack
  • Dispatch and production planning worked out in a spreadsheet one person owns
What You Get

What is different once the work is done.

  • One screen showing output, scrap and downtime by machine and by shift
  • Stock and dispatch records that update as goods move, not the morning after
  • Production reports the office can pull without walking down to the line
  • The plant network kept apart from the office network, with old controllers isolated
What we build

Software we build for industry & manufacturing

  • Machine data collection

    Reading output, cycle times and stoppages from controllers, local PCs or an OPC server nobody has touched in years, on a schedule, into one database.

  • Shop floor screens

    Output, scrap and downtime by machine and by shift, on a display the line can actually see, designed for the lighting and the gloves rather than for a desk.

  • Stock and dispatch

    Goods in, picking and goods out that move stock when the barcode is scanned, with dispatch notes, labels and customer paperwork off the same record.

  • Downtime reason codes

    A short prompt in front of whoever restarts the line, so the log builds itself over weeks and you get an honest ranking of what actually costs you.

  • Traceability

    Batch and serial history joined across production, quality checks and dispatch, so a recall question is a query rather than three people and a filing cabinet.

  • Plant network separation

    The single most valuable control in a factory: keeping equipment that cannot be patched away from the laptops that open email.

Systems

What we work alongside

  • Your ERP

    We build against it rather than replacing it, writing where it is the record of truth and reading everywhere else. Finance keeps working in the system it knows.

  • Controllers and PLCs

    Including equipment older than the people running it. Serial, a written file, or an OPC server. We find out what a line can expose before quoting for it.

  • SCADA and historians

    Where one already exists it is usually the cheapest source of truth in the plant, and it is routinely under-read because nothing was ever built on top of it.

  • Scanning hardware

    Handhelds and fixed scanners integrated properly, with the hardware trigger and barcode engine used as such rather than emulating a keyboard.

  • Quality records

    Inspection results and certificates joined to the batch they belong to, so traceability does not depend on a spreadsheet somebody maintains privately.

  • The office network

    Kept deliberately separate, with saved configurations held for the equipment most likely to fail so a replacement is an afternoon rather than a week.

Where to start

Where these projects usually begin

  • One line, one screen

    Not the whole plant. Pick the line that matters most, get its output and downtime onto a screen, and let it prove the approach before it is repeated.

  • A downtime log that builds itself

    Cheap, fast, and it settles arguments that have run for years. A few weeks of honest reason codes usually reorders what everyone assumed was the worst machine.

  • Stock that matches the rack

    Usually triggered by a driver waiting at the gate. Scanning at goods in and goods out fixes more than any amount of counting discipline.

  • Splitting the networks

    Often the first thing we are asked for after an incident elsewhere in the group. It is also the work that needs the least downtime to do.

FAQ

Questions we get asked

Can you get data off machines that are twenty years old?

Usually, and where we cannot we say so rather than quoting for an integration that will not exist. Older controllers often expose more than people assume, through a serial port, a local file the machine writes, or an OPC server nobody has looked at. Where a line genuinely cannot talk to anything, the honest answer is a tablet in front of the operator, which costs a fraction of the alternative and gets you the reading.

Do we have to replace our ERP?

No. Most of what a plant needs sits alongside the ERP rather than inside it, and finance should keep working in the system it knows. We build against your ERP, writing to it where it is the record of truth and reading from it everywhere else. Replacing an ERP is a programme in its own right and it should never be a side effect of wanting better shop floor reporting.

Will this need the line to stop?

The data collection side does not: reading from a machine is passive and can be set up while the line runs. Where a change does need downtime, it goes into a window the plant agrees to, which in practice means a night or a Sunday, and it is rehearsed before it is done.

How do you keep the plant network safe?

By keeping it apart from the office network, which is the single most valuable control in a factory. Old controllers cannot be patched and should never be reachable from a laptop that opens email. We segment the two, isolate what cannot be updated, and hold saved configurations for the equipment most likely to fail so a replacement is an afternoon rather than a week.

How small can we start?

One line and one screen, which is usually the right answer rather than a compromise. Pick the line that matters most, get its output and downtime onto a display the shift can see, and let it prove the approach before it is repeated across the plant. That costs a fraction of a site wide programme and it produces the thing that actually decides whether this goes further: a few weeks of honest numbers from equipment your people recognise. Plants that start everywhere at once usually spend the first quarter on integration and have nothing on a screen to show for it, which is how these projects lose their sponsor.

Our operators are not going to use another screen. What then?

Then it fails, and that is worth saying plainly because it is the most common way shop floor software dies. The defence is designing against the actual conditions rather than the specification: badge or card sign in rather than a password typed with gloves on, four or five reason codes rather than forty, targets big enough for a gloved hand, and readable under the lighting the plant genuinely has. The test is not whether it works in a demonstration. It is whether the data is still honest three weeks in, when the line is behind and nobody is watching. We check that with the supervisor, not with the sponsor.

We already have an MES. Does this replace it?

Almost certainly not, and an MES you already run is usually the cheapest source of truth in the building rather than a competitor. The common situation is that it holds far more than anyone reads, because nothing was ever built on top of it and the reporting it ships with was designed for a different plant. We build against it, take what it already records, and add only the parts it genuinely does not do. Replacing an MES is a programme with its own budget and its own risk, and it should never happen as a side effect of wanting a downtime ranking.

Can you help with traceability for a recall or an audit?

Yes, and the work is joining records that already exist rather than creating new ones. Batch and serial history usually sits in three places: production knows what ran when, quality holds the inspection results, and dispatch knows where it went. Each is fine on its own and the join is what nobody built, which is why a recall question turns into three people and a filing cabinet. We connect those so the answer to which customers received material from this batch is a query. It is worth doing before you need it, because the week you need it is the worst week to start.

Ready to talk about your IT?